Which guide should you open first?
The guides describe intended capabilities and design intentions, not evidence of outcomes. Results depend on implementation, data quality, ownership and tooling. eGRACS has not yet been independently evaluated.
GUIDE 01 · 2 PAGESPathway B · Test the change and its value
The same architecture. A different day for each level.
What Changes for You
The problem it addresses
Governance, management and execution look at the same control environment from different places, and each meets a different problem. Executives want a picture they can trust. Managers want fewer parallel structures to maintain. The people who perform and evidence controls want to know what is theirs, and not to supply the same thing twice.
What you will learn
- What people at each of the three levels may expect to see change in their day-to-day work.
- The one question to put to your team at each level.
- Which harder-to-measure benefits (confidence, shared language, fewer surprises) are worth testing in your own team.
Who should read it
- Boards, executives, policy owners, heads of risk and audit
- Control and process managers, GRC and risk leads, architects
- Control operators, administrators and evidence coordinators
A first testPut one “ask your team” question to each level, then compare the answers. Where would a new obligation fit in our current control structure?
GUIDE 02 · 2 PAGESPathway B · Test the change and its value
The point is not fewer hours. It is what the hours go back into.
Where the Effort Goes
The problem it addresses
Much governance effort goes into keeping administrative structures current: ownership matrices, parallel control sets and separate evidence trails. A second drain is the steady volume of ad hoc and interim reporting requests, and dashboards that go unused because each covers one framework, process or function and connects to none of the others.
What you will learn
- How an illustrative scenario models a transition year, with old and new approaches running side by side, rather than an overnight change.
- Why the reduction in hours is treated as potential capacity to reallocate (to risk assessment, control improvement, assurance, remediation and decision support), not as a separate saving.
- How a connected dashboard differs from a consolidated report, and what it depends on: ownership, relationships and evidence at every tier.
Who should read it
- Governance, risk and audit leads who field repeated reporting requests
- Managers who maintain parallel control sets or ownership matrices
- Anyone asked whether the effort could be better spent
A first testCount how many ad hoc or interim reports your team produced last quarter, and how many hours they took. Then trace one indicator your executives see to an owner and evidence.
The scenario figures are illustrative placeholders covering ownership-matrix maintenance only. They are not measured outcomes.
GUIDE 03 · 2 PAGES + EXCELPathway B · Test the change and its value
Your numbers. Your assumptions. Your case.
Build Your Own Case
The problem it addresses
The financial model in the eGRACS documents uses placeholder figures from a worked scenario. Someone else’s predicted saving tells you little about your organisation. This worksheet starts from your current effort instead, and works in hours before dollars.
What you will learn
- Which inputs you need and where to find each one, from the rate card to a short time-tracking sample.
- How transition-year and steady-state effort are worked out, step by step.
- Which optional areas (reporting, audits, regulatory change) to record separately until you have validated them.
- A five-question self-check before you rely on any result.
Who should read it
- Governance, risk or GRC leads who need to take numbers to a sponsor
- Finance partners asked to test the assumptions
- Anyone who wants to size the effort before deciding whether to look further
A first testTake a 4 to 6 week time-tracking sample of your current governance administration effort. Measure it rather than estimating from memory.
An estimation aid, not a validated business case. Treat the result as an estimate to test, not a promise, and do not circulate it as a funding request until every input is your own.
GUIDE 04 · 2 PAGESPathway B · Test the change and its value
Not everything that matters can be counted. It can still be checked.
The Intangibles
The problem it addresses
Some of what a shared structure changes is hard to put a number on: confidence, clarity, friction, calm. Benefits like these tend to be left out of an evaluation, or asserted without evidence. This guide offers a way to check them without inventing figures.
What you will learn
- Six intended benefits: confidence in the picture, a shared language, less friction at boundaries, fewer surprises, work visibly tied to its purpose, and easier onboarding and handover.
- Which design feature each one comes from.
- A simple test for each, which you can run in your own team before and after a change.
- Why an honest “not yet visible” is more useful than a claim you cannot support.
Who should read it
- Team leads and managers who sense friction that no timesheet captures
- Sponsors weighing benefits beyond hours
- Anyone building an internal case who wants to keep it honest
A first testAsk three people at different levels the same question about one control. Do their answers agree, and can each say where the evidence is?
These are intended benefits, not measured outcomes. The guide attaches no figures to them, and neither should you until you have your own evidence.
GUIDE 05 · 1 PAGEPathway A · Start from your role
One structure. One question: where is the evidence?
For Executives and Boards
The problem it addresses
You are accountable for the control environment as a whole, yet new obligations tend to arrive as new projects, and the picture you receive is assembled by hand. How confident can you be that an indicator on your dashboard connects to a control, an owner and evidence?
What you will learn
- What a connected view could mean for oversight, reporting, new obligations and assurance.
- Three questions worth putting to your team.
- What must be in place for the connected view to be true, not just drawn.
Who should read it
- Boards and executives
- Policy owners
- Heads of risk and audit
A first testAsk for one indicator you already report to be traced to its control, owner and evidence. What the team can and cannot show is your starting picture.
GUIDE 06 · 1 PAGEPathway A · Start from your role
Know what is yours. Supply it once.
For Administrators
The problem it addresses
Duplicate evidence requests. Unclear ownership of which control is yours. A scramble at audit time. When evidence is organised by request rather than by control, the same item can be supplied again and again to different people.
What you will learn
- How a request can point to a control and its owner, so you know whether it is yours and whether you have already answered it.
- What it could look like to keep evidence against the control it supports, related to each requirement it serves.
- Three questions to put to your team about where evidence lives and how change reaches you.
Who should read it
- Control operators
- Administrators
- Evidence coordinators
A first testList the evidence requests you answered last quarter. Mark any you supplied more than once. That list is your case for organising evidence by control.
GUIDE 07 · 1 PAGEPathway A · Start from your role
Your control, one place in the structure, one set of evidence.
For Control Owners
The problem it addresses
Ownership can be implicit, dependencies sit in people’s heads, and each framework asks for its own version of your control. You end up reconstructing the same account every time someone asks.
What you will learn
- How a control can have a defined tier, domain and neighbours.
- How its three dimensions (governance, management, administration) show who sets expectations, who runs the process and who performs and evidences it.
- What it could mean to review a mapping when a rule changes, instead of rebuilding your description.
Who should read it
- Owners of Strategic, Operational and Tactical controls
A first testPick one control you own. Write down its tier, domain, three dimensions and two dependencies. Gaps in that one-page note show where the structure would help most.
After the guides
Whichever guide you read first, the next step is the same: run one first test and see what it shows. You can then decide whether to explore further, test the case with your own numbers, scope a limited pilot, defer, or conclude that it is not a fit.
Return to the decision section → Open the worksheet →
Described benefits are design intentions; results depend on implementation. Worked financial figures are illustrative, not measured results.