Four ground rules

Your evidence, not ours.The guides describe intended capabilities. The figures in them are illustrative placeholders. Only your own observations and numbers should carry a decision.
Every outcome is legitimate.Deferring, or deciding it is not a fit, is a finding. It is not a failed evaluation.
Hours before dollars.Start from your measured current effort. Treat any financial result as an estimate to test, not a promise.
“Not yet visible” is an answer.If the evidence is thin, say so. That is more useful than a claim you cannot support.

eGRACS has not yet been independently evaluated. Outcomes depend on organisational context, implementation, data quality, ownership and tooling.

Step 1 · About 30 minutes

Run the trace

Select one control, one reported indicator, or one recurring reporting activity. Then establish what you can trace today.

  1. Pick one. Choose something already in use: an indicator your executives see, a control you own, or a report you produce every quarter.
  2. Follow it. Can you get from the indicator to its control, from the control to its owner, and from the owner to the evidence? Note where you had to ask someone, or could not continue.
  3. Note the repeats. Which evidence requests have you answered more than once? Which requirements does the control serve, and where does that mapping live?
  4. Write down what changed your mind. A trace that was easy is as informative as one that was hard.
Short on time? The one-line version: take one indicator you already report, and ask your team to show you its control, its owner and its evidence this week. See Guide 05 →

Role-specific versions of this trace: executives and boards · administrators · control owners.

Step 2

Read the result

These are prompts for your own judgement, not a scoring system. Match what the trace showed to the outcome it most often points to.

If the trace showed…Consider…
It was easy. Indicator, control, owner and evidence were all at hand, and requests are rarely repeated.Not a fit, for now
It was hard in places, but you cannot yet say why, or what a different structure would involve.Explore the architecture further
Real gaps: unclear owners, duplicate requests, parallel control sets. Colleagues will want numbers.Test the case internally
Clear gaps, a named owner, a defined area, and agreement on what you would measure.Scope a limited pilot
Gaps exist, but capacity, timing or priorities are against it.Defer, and note when to revisit
You could not do the trace at all because the records underneath do not exist.Fix the records first, then revisit

The last row matters. A connected view depends on ownership, relationships and evidence records existing at every tier, and is built in your own tooling. Where records are incomplete, the view shows the gaps.

Step 3 · Outcome A

Explore the architecture further

Choose this if
Your trace raised questions you cannot yet answer, or you want to understand how the structure works before spending effort on numbers.
What you would need
A few hours from one or two people to read the guides and the technical literature, and a willingness to write down what remains unclear.
First step
Read Guide 01, then the eGRACS Architecture and Schema guides.
Move on when
You can describe in your own words what would change for each level (governance, management and execution), or you have concluded that nothing would.
Step 3 · Outcome B

Test the case internally

Choose this if
Your trace showed duplicated effort or unclear ownership, and colleagues or a sponsor will want to see numbers before anything else happens.
What you would need
A fully burdened labour rate, a short time-tracking sample of your current governance administration effort, and your own implementation, transition and tooling assumptions.
First step
Take a 4 to 6 week sample of current effort. Then complete the seven required inputs in the worksheet.
Move on when
Every input is yours rather than a placeholder, and a colleague who was not involved has challenged your assumptions.
Guard rail. Do not circulate the result as a funding request until every input is your own. Record optional reporting and change effort separately, and leave out any benefit you cannot support.
Step 3 · Outcome C

Scope a limited pilot

Choose this if
You have a defined area, a named owner, and agreement on what you would measure, including what result would tell you it is not working.
What you would need
A scoped area, a baseline, success measures set in advance, an executive sponsor, and the ownership and evidence records the connected view relies on.
First step
Write down your baseline and the result that would make you stop. Do this before anything is built.
Move on when
The pilot has produced your own figures for steady-state effort and transition, which the worksheet asks for and nothing else can supply.
Plan for a transition. A single-day cutover usually overstates the first year. Allow a period in which old and new run side by side. To discuss scoping, tell us what you have in mind →
Step 3 · Outcome D

Defer

The timing, capacity or priorities are not right. That is a sound reason to stop for now.

  • Write down what would have to change for you to revisit it.
  • Keep your trace notes. They become your baseline later.
  • Set a review date, not an open-ended “later”.
Step 3 · Outcome E

Not a fit

Your current approach already answers the three questions: can you trace an indicator to evidence, how many parallel control sets you keep, and where repeated requests arise.

  • That is a valid and useful finding.
  • If you can say why, we would like to hear it. It sharpens the guides.
Before you proceed

Two short checklists

Before you build an internal case

  • Is each input yours, not a placeholder?
  • Is current effort measured, or estimated from memory?
  • Is the transition realistic?
  • Have you left out any benefit you cannot support?
  • Where will the freed capacity go? Write it down. It is the point of the exercise, and it is not a separate saving.

From Guide 03.

Before you scope a pilot

  • What exactly is in scope, and who owns it?
  • What is the baseline today, in hours and in what you can trace?
  • What would you measure: effort, repeated requests, traceability, or the intangibles?
  • What result would tell you it is not working?
  • Do ownership and evidence records exist at every tier, or must they be created first?
  • Who sponsors it, and who decides at the end?

Intangibles tests: Guide 04.

What counts as evidence at each stage

Be explicit about what each source can and cannot support.

Illustrative scenarioPlaceholders from a worked example. Useful for understanding the model.Cannot support a decision.
Your first traceOne control, indicator or report, followed by hand.Supports exploring further.
Your measured effortA time-tracking sample run through the worksheet.Supports an internal case, as an estimate.
Your pilot resultsYour steady-state and transition figures, with success measures set in advance.Supports a wider decision.

Who to involve

An evaluation done by one person tends to reflect one seat. These are the people whose answers differ most.

RoleTheir question
Executives and boardsCan we trace one reported indicator to its owner and evidence this week?
Managers and GRC leadsHow many separate dashboards or control sets exist for rules that largely overlap?
AdministratorsWhere is the evidence for my control kept, and is it the single copy?
Control ownersCan I list the frameworks my control is related to, and where that mapping lives?
FinanceIs each worksheet input an observed figure or an assumption?

Record your decision

Whatever you choose, a one-page note keeps the evaluation honest and lets you revisit it. Suggested fields:

  1. What I traced, and what I could and could not show
  2. What the evidence supports, and what it does not
  3. The outcome I chose, and why
  4. What I assumed rather than measured
  5. Who challenged this, and what they said
  6. What would change my mind
  7. Next step, owner and review date

Open the worksheetBack to the seven guides

Question or challenge?

Disagree with an assumption, found a gap in a guide, or want to talk through a pilot? We would like to hear it, whichever outcome you reached.

Tell us →

The guides describe intended architectural capabilities and potential benefits. Outcomes depend on organisational context, implementation, data quality, ownership and tooling. Worked financial figures are illustrative, not measured results.